Datacenters · One-page PDF, refreshed quarterly

Long-Lead Equipment Calendar

Reported lead times for transformers, switchgear, generators, UPS and chillers, with the source for every figure, and what they mean for a build schedule and a loan.

  • Lead-time ranges by equipment class, each one cited
  • How to work order dates back from energization
  • Where deposits fall, and why lenders care
Free download

Get the calendar

Tell us where to send it. The link arrives by email in a minute or two.

We use your email to send this and, occasionally, related material. Unsubscribe any time. Privacy Policy

what it leads to

When the document doesn't settle it: Datacenters

This is the same material we work from on paid engagements. When your answers raise more questions than they settle, that is where Datacenters starts.

More for Datacenters

Drawing: facility one-line A utility feed passes through a transformer, switchgear and a UPS with generator backup to power distribution and a row of racks. A cooling loop runs from a chiller to the white space. The transformer and switchgear are marked as long-lead items with deposits due, and the racks are marked with their density in kilowatts per rack. Summit Logic Facility one-line Dwg SL-0006 Sheet 1 of 1 Rev A Not to scale Utility Transformer Long lead, deposit due Switchgear Long lead, deposit due UPS Ride-through Generator PDU 8 kW 8 kW 8 kW 8 kW 30 kW+ White space Cooling Supply Return Air or liquid A Assessment Power: capacity and the date it arrives Cooling: what density demands A: racks above 30 kW change the design

Rather talk it through?

Forty-five minutes. Bring the question this document is about and we will tell you which answers decide it.

Book a discovery call