Datacenter Operators

Capacity, power and cooling, engineered and financed from one desk.

For regional colocation operators, enterprise IT and HPC teams, crypto miners converting to AI, and small builders and developers. We assess what the facility needs, model whether it pencils out, and arrange the equipment financing, so the engineering and the credit are answered together.

13+ HPC datacenters designed, built and managed, run to 99.99% uptime · Equipment finance · Veteran-owned

the problem

The upgrade costs more than cash flow covers

Capacity, power and cooling upgrades rarely fit inside operating cash flow. Long-lead equipment needs deposits long before it is delivered, denser racks change the electrical and cooling design, and lenders ask questions the team has never had to answer in financial terms.

  • Transformers and switchgear quoted with lead times longer than the plan
  • Deposits due before anything is installed or earning
  • A customer asking for 30 kW racks in a room designed for 8
  • A lender asking about residual value, coverage and contract term, not just the hardware
the market

The market you are building into

Demand is outrunning power, equipment and space. Every figure below links to its source.

the assessment

What a technical assessment covers

Seven things decide whether a facility can deliver what it promises, and what it will cost to get there.

Site Zoning, structure, floor loading, room to expand, and whether the equipment can physically get in the door.
Power Utility capacity and the date it arrives, service voltage, redundancy, backup generation and fuel, and the real cost per kilowatt-hour.
Cooling Air or liquid, heat rejection capacity, water use, and what the target rack density actually demands.
Density Current and target kilowatts per rack, and what changes in the electrical and mechanical design above 30 kW.
Network Carriers on site, diverse routes in, and latency to the customers the facility will serve.
Procurement Transformers, switchgear, generators, UPS and cooling plant: lead times, deposits and the delivery schedule they set.
Operations Monitoring, maintenance and staffing, and the uptime the design can realistically support.
what we do

One desk for the engineering and the financing

  1. Datacenter Infrastructure

    Technical assessment

    Site, power, cooling, density, network and procurement, assessed against what the facility has to deliver, with the gaps and the likely cost to close them.

  2. Datacenter Infrastructure

    Owner's representative

    On your side of the table during the build: design review, vendor bids, schedule and commissioning, from someone who has run the facilities afterwards.

  3. Datacenter Infrastructure

    Equipment financing

    Financing for compute, power and cooling equipment, including deposit and progress-payment financing for long-lead gear, arranged with lenders who fit the deal.

  4. Technical Financial Models

    The feasibility model

    Buy, lease or cloud; total cost over five years; debt capacity and coverage, stress-tested; and exactly what a lender will require before the package goes out.

One model, built for operations and finance

What operations needs to know

  • Whether the site can carry the load: power, cooling, floor and density
  • Which equipment has the longest lead, and when the deposit is due
  • What the build actually needs, from switchgear to the last rack

What finance needs to prove

  • Buy, lease or cloud, and the total cost over five years
  • How much debt the project can carry, and the coverage it leaves
  • Exactly what a lender will require before the package goes out

One model, built for both, ready for the lender.

how to start

Start with the question on your desk

  1. 01

    A workflow review

    Forty-five minutes on the project, the timeline and what the lender has already asked.

  2. 02

    The assessment and the model

    Built on your site, your quotes and your contracts, so the answer is yours, not a benchmark.

  3. 03

    The lender package

    The model, the technical findings and the evidence, assembled for the lenders who fit the deal.

What the assessment is, and is not

An independent technical and financial assessment from an operator's point of view. It does not replace a licensed engineer's stamped design, permits or utility studies, and every credit decision stays with the lender.

Bring us the project you are trying to fund

Tell us the facility, the equipment and the timeline. We will tell you what a lender will ask, and what to have ready.

Book a workflow review

Financing is arranged with third-party lenders and is subject to lender approval.